Project: New Bathroom – Day 6 & 7

Things are taking shape rapidly. Our contractor believes the job will be wrapped up by this coming Friday; that’s a full week ahead of schedule! Behind the drywall in the following pictures are the finalized (and inspected) electrical connections as well as all the plumbing connections.

Below is the little stub wall that will provide a little privacy for the john or the loo or the pot…

Below is the connection for Adam’s sink as well as the pipe for the tub (coming up from the floor).

Tile goes in shortly and the walls are about to get primed and painted! More updates are coming soon!